(763) 592-2060 | ast@ast-corp.net
  • Newsletter
  • Sign In
    Login Form

Adhesive Dispensing Equipment Manufacturers Adhesive Dispensing Equipment Manufacturers
  • Applications
    • Industrial Applications
      • SIPS
      • Bonding & Dispensing
      • Spray / Spatter
      • Molding
      • Engineered Systems
      • Foam-In-Place Gasketing
      • Potting
    • Contractor Applications
      • Bridge Deck Repair
      • Crack Injection
      • Doweling
      • Joint Filling & Sealing
      • Spray
      • Other Applications
    • Cartridge Filling
      • Front Fill Units
  • Products
    • Industrial Product Lines
      • CMP Product Line
      • GMP Product Line
      • RMP Product Line
      • Cartridge Filling
    • Construction Equipment
      • Applications
      • Materials
        • Epoxy
        • Polyurea
        • Silicone
        • Urethane
        • Fire Stop
        • Polysulfide
      • Product Line
        • PCH GMP-025 ‘LIL PRO
        • PCH GMP-050 PRO
        • SOC-050 “HUSKIE”
        • Other Products
    • Design Concepts
    • Dispense Valves
    • Static Mixers
  • Support
    • FAQ
    • Product Literature
    • Static Mixers
    • Terms & Conditions
  • Proposal
  • Shop
  • About AST
    • Location
    • Company
    • Contact
    • Product Literature
  • CORPORATE
    • Contact Us
    • About
    • Careers
    • Find Your Team
0
Cart: $0.00
  • Applications
    • Industrial Applications
      • SIPS
      • Bonding & Dispensing
      • Spray / Spatter
      • Molding
      • Engineered Systems
      • Foam-In-Place Gasketing
      • Potting
    • Contractor Applications
      • Bridge Deck Repair
      • Crack Injection
      • Doweling
      • Joint Filling & Sealing
      • Spray
      • Other Applications
    • Cartridge Filling
      • Front Fill Units
  • Products
    • Industrial Product Lines
      • CMP Product Line
      • GMP Product Line
      • RMP Product Line
      • Cartridge Filling
    • Construction Equipment
      • Applications
      • Materials
        • Epoxy
        • Polyurea
        • Silicone
        • Urethane
        • Fire Stop
        • Polysulfide
      • Product Line
        • PCH GMP-025 ‘LIL PRO
        • PCH GMP-050 PRO
        • SOC-050 “HUSKIE”
        • Other Products
    • Design Concepts
    • Dispense Valves
    • Static Mixers
  • Support
    • FAQ
    • Product Literature
    • Static Mixers
    • Terms & Conditions
  • Proposal
  • Shop
  • About AST
    • Location
    • Company
    • Contact
    • Product Literature
  • CORPORATE
    • Contact Us
    • About
    • Careers
    • Find Your Team
Home / Products & Solutions / Construction Equipment / PCH GMP-500
Return to Previous Page

PCH GMP-500

Applications:

Bridge Deck Coating, Parking Deck Coating, Spray

Materials:

Polyureas, Unfilled Urethanes, Unfilled Epoxies

Features & Benefits

  • Uses AST GMP metering pump
  • Continuous flow up to 5 gpm
  • Fluid pressures up to 1000 psi
  • Viscosities up to 5,000 cps
  • Fixed Ratios of 1:1 to 4:1
  • Variable flow rate
  • 5 HP DC drive motor
  • Automatic dispense manifold
  • Electric/pneumatic powered
  • Pumps non-abrasive materials
  • Optional spray head

PDF-download

 

Download Tech Data Sheet

Additional Information

Troubleshooting

As soon as a problem is noticed, immediately remove the disposable plastic mixer nozzle and try dispensing material. This may prevent or purge material cross-over if it has not already hardened. After the static mixer is removed, THEN check the following:

  • Is the dispense manifold plugged? (material set up)
  • Is there sufficient material in the tanks?
  • Is the pressure at the outlet gauges changed from normal?
  • Do a ratio check to determine flow and ratio.

Do a ratio check at the dispense valve:

  • Check to see if there is flow from both pumps.
  • Check to see if the check valves are cutting off material evenly when the trigger switch is de-activated.
  • Measure the volume output of each material.

If ratio check is not correct, the problem is in the meter.

  • Is air entrapped in pumps or hoses?
  • Check to see if the drive chain is loose or worn.
  • If chain is removed, is one of the pump sprockets frozen? Can the pump be rotated by using a large pliers on the sprocket?

GMP-500 Troubleshooting Guide

Operation Instructions

Start-up

  • Check level of materials in containers, making sure level is always over 1/3
  • Clean off the dispense manifold with plastic mixer nozzle removed. Pump material into waste container to verify smooth, air-free flow of both materials. Wipe head clean and coat the dispense manifold with compatible lubricant.
  • Place new plastic mixer nozzle on applicator block and secure with mixer retainer nut.

Shut-Down

  • Turn off motor controller and disconnect the plug from power.
  • Remove plastic mixer nozzle and discard.
  • Clean head of applicator and coat the threads and tip with compatible lubricant.
  • Lubricate grease zerks on applicator head. Fill until the lubricant comes out of the ports (holes) where the mixer is attached. Wipe away any displaced material.
  • Lubricate grease zerks on the side of each pump. The chamber being filled is between the shaft seals.
  • Lubricate the pump’s internal gears:
    • Open the end of the bleed valve on the bottom of each pump.
    • Fill the zerk on top of the pump until fresh lubricant comes out the hole in the side of the bleed valve.
    • Close the bleed valve.
  • Verify that tanks are over 1/3 full.

Tips & Precautions

Daily Maintenance

  • Keep the instruction manual.
  • Never permit either material tank to get below approximately 1/3 full.
  • A common problem is cross-over (one material crossing over into the other material’s manifold and/or hose). Damage and cost from cross-over is NOT covered under AST Corporation Warranty. Cross-over can be avoided by carefully following instructions.
  • If the gauges display pressures that “peg” the needle, immediately remove power from machine.
  • Do not install a disposable mixer nozzle to the dispense manifold until positive air-free flow is achieved from both outlets of the applicator block tip.
  • Air can be trapped in hoses during filling of an empty system. To avoid trapping air, arrange the hoses to obtain a continuous gradual upward slope of the hose from the pump outlet to the applicator while the system is pumping at low speed. Point the dispense assembly upward to let the material push the air out.
  • Two zerks are provided on each side of the dispense manifold, where the static mixer is attached to the applicator. These are provided so that the operator can remove the mixer and fill the ports of the manifold with a compatible lubricant. This helps prevent problems with material hardening in the manifold, and should be done when the unit is left unused for any period of time.
  • The gearotor pumps are lubricated in two places. Both should be lubed daily. When the zerk on the top of the pump is filled, the bleed valve at the bottom of the pump must be opened. Lubrication is complete when fresh lubricant is pushed out from the bleed valve.
  • The maximum cord length that can be used is 100 feet using 14 gauge wire.
  • This unit must be used with ground fault protection

Questions?? Call us! If you’re with the machine, we can walk you through the procedure for start-up and shut-down. Ask for Technical Assistance at (763) 592-2060.

Periodic Maintenance

Clean and Lubricate Gearotor Pumps

  • Remove and clean any material residue or film with compatible solvent (damp pad only – do not pour solvent).
  • Lubricate with compatible lubricants.
  • If leakage appears at shaft, replace seals.

Clean Dispense Assembly

  • Remove check valves. Disassemble & clean. Replace o-ring if necessary.
  • Clean the threads and ports of the dispense manifold. If necessary, it can be removed and soaked in a compatible solvent.

Ratio Check

  • Remove the retainer cap or mixer nozzle.
  • Trigger applicator; two separate beads of material will appear; compare for correct volume.

GMP-500 Videos

GMP-500 Accessories

Construction Products

  • PCH GMP-025 ‘LIL PRO
  • PCH GMP-050 PRO
  • PCH GMP-050 Spray
  • PCH GMP-075 BIG PRO
  • PCH GMP-500
  • PCH GMP-1000
  • NF RMP-624 MINI BRUTE
  • RMP-624/824 BRUTE
  • PCH CMP-632/832 BRUTE II
  • PCH 317PV “VIP”
  • PCV SP-5 Gal. Smart Pump
  • PCV SP-55 Gal. Smart Pump

Construction Applications


Construction Materials


Request More Information

CORPORATE

Contact
About Us
Careers
Find Your Team

Adhesive Systems Technology

1600 Freeway Boulevard
Brooklyn Center, MN 55430
Phone: (763) 592-2060
Fax: (763) 592-2075
Email: ast@ast-corp.net

PRODUCTS

Industrial Products
Construction Equipment
Dispense Valves
Design Concepts

SUPPORT

Technical Support
FAQ
Proposal / Quote
Terms & Conditions

SHOP

Accessories
Mixers & Nuts
Pumps
Seals & O-Rings
Valves

Search engine

Use this form to find things you need

Login

Lost Password? Create Account