Applications:
Large Joint Sealing, Large Spall Repair, Channel Filling, Doweling,
Anchoring, Bonding
Materials:
Filled Epoxies, Filled Urethanes, Unfilled Epoxies, Unfilled Urethanes
Large Joint Sealing, Large Spall Repair, Channel Filling, Doweling,
Anchoring, Bonding
Filled Epoxies, Filled Urethanes, Unfilled Epoxies, Unfilled Urethanes
The following basic points can be checked for troubleshooting the metering pumps:
To determine if there is a problem in the air control, air drive, fluid pump, or outlet hose and nozzle gun:
Seal Check / Check Valve Diagnostic Procedure:
NOTE: OUTLET GAUGE SHOULD BE PLACED DOWN STREAM OF OUTLET CHECK VALVE. The outlet volumes of each pump cycle should be repeatable if properly working. A simple volume check in field is a quick check for operator.
Start-up
Shut-Down
Daily Maintenance
Questions?? Call us! If you’re with the machine, we can walk you through the procedure for start-up and shut-down. Ask for Technical Assistance at (763) 592-2060.
Clean and Lubricate Exposed Pump Rods
Check that air supply and air filter are clean, and drain moisture separator.
Ratio Check Test:
Seal / Pump Check Test:
Check Pump Phasing: To “Phase” your system, simply watch the outlet gauges while dispensing material with the static mixer attached. Phasing is correct when both pressure gauges start to rise at the same time during the dispense stroke. Adjust the pump connecting rods in or out slightly to ensure that this occurs. Please note: