Industrial Systems Construction Equipment Request For Proposal Parts/Service Company Profile

Construction Equipment
Applications
Product Line
Materials
Dispense Valves
Photo Gallery
Video Menu
Cost Savings
Tech Support
Questions & Procedures
Associations
Home Page

GMP-050 Extra Information
Tech Data Sheet
Video of GMP-050
Action Photos
Component Photos
025 Parts List
050 Accessories
Operation Instructions
Periodic Maintenance
Tips & Precautions
Troubleshooting

Daily Operation - Start Up & Shut Down for GMP-050

Start-Up

  1. Check level of materials in containers, making sure level is always over 1/3
  2. Clean off the dispense manifold with plastic mixer nozzle removed. Pump material into waste container to verify smooth, air-free flow of both materials. Wipe head clean and coat the dispense manifold with compatible lubricant.
  3. Place new plastic mixer nozzle on applicator block and secure with mixer retainer nut.

Shut-Down

  1. Turn off motor controller and disconnect the plug from power.
  2. Remove plastic mixer nozzle and discard.
  3. Clean head of applicator and coat the threads and tip with compatible lubricant.
  4. Lubricate grease zerks on applicator head. Fill until the lubricant comes out of the ports (holes) where the mixer is attached. Wipe away any displaced material.
  5. Lubricate grease zerks on the side of each pump. The chamber being filled is between the shaft seals.
  6. Lubricate the pump's internal gears:
    • Open the end of the bleed valve on the bottom of each pump.
    • Fill the zerk on top of the pump until fresh lubricant comes out the hole in the side of the bleed valve.
    • Close the bleed valve.
  7. Verify that tanks are over 1/3 full.